Hitches

Pile Hitch

DIFFICULTY ○○○○

A temporary post attachment made with a bight, so you do not need to feed the whole rope end around the post.

attachmentrope
See it tied step-by-step ↗

Practice sequence

  1. Take a doubled section around the post and beneath the standing part.
  2. Lift the bight over the top of the post.
  3. Pull the standing part to seat the hitch and keep the attachment attended.

Use the linked animation to check the crossings. These notes are for learning; climbing, rescue, and lifting require qualified instruction and equipment-specific procedures.

Which knot should you choose?

If you cannot reach over the post, compare with a Round Turn and Two Half Hitches. A Bowline makes a fixed eye instead.

Why it earns its place

Quick to place and remove when the top of the post is accessible.

Where it fails

Use for temporary, attended attachments. It is not recommended as a permanent mooring hitch.

Quick facts

FunctionRope attachment
Practice level1 / 5 (editorial rating)
TutorialAnimated Knots by Grog

Source and editorial notes

Reference: Animated Knots by Grog: Pile Hitch. Source checked 2026-09-11. Selection advice and difficulty ratings are editorial judgments, not strength tests. How this guide is prepared.

Related knots